Brief Description
Milner Hall is of considerable importance on both religious and architectural grounds. It is believed to be the first Catholic Church in England to be consecrated (1792) following the Reformation. As part of the refurbishment plan, MTA were appointed to design new heating and lighting systems.
Project Details
Location: Hampshire
Client: Hampshire Downs Catholic Parish
Date: 2017
Professional Services
Martin Thomas Associates were appointed to undertake all the Mechanical and Electrical Consultancy Work.
Services Include
LTHW heating system
Gas supply
Domestic water systems
Mechanical ventilation
Above ground soil and waste systems
Electrical distribution systems
Small power installations
Alterations to fire alarm system
Lighting and emergency lighting
Data and AV wiring
Download: Milner Hall
Theatre ceiling after
Milner Hall before refurbishment